- Article no.
- IRT-CUR-017
- Category
- Rail infrared dryer
- Workflow
- PcAuto rail curing
- Result
- Controlled coverage
- Use case
- Larger bodyshop bays
- Curing technology
- Rail-mounted infrared curing with PcAuto support
- Unit format
- Fixed rail infrared dryer route
- Repair scope
- High-consistency paint-area curing across repeated jobs
- Control method
- Confirm rail travel, PcAuto routine, repair size, and operator handover
- Workspace fit
- For workshops ready to standardize curing around bay infrastructure
- Best fit trigger
- Choose Rail IR PcAuto when the buyer wants professional IR control in a fixed bay or booth layout without the UVA capability of Rail Combi.
- Main difference
- This is the fixed IR-only production route: cleaner and more structured than mobile PcAuto, simpler than IR-UVA Combi or iCure.
- Setup check
- Confirm rail mount, bay size, reach, power, vehicle movement, PcAuto settings, and whether 4-10 or 4-20 capacity is correct.
- Aftercare route
- Plan rail service, lamp and reflector maintenance, operator program training, and safe movement procedures.
- Next decision
- Confirm whether the proposal needs fixed IR-only rail, mobile PcAuto, Rail Combi, or iCure.
- Product role
- Rail-mounted IR curing
- Common applications
- Mounted infrared curing, Paint booth support, Larger repair bays
- Decision focus
- Rail-mounted infrared curing for structured repair environments.
- Product tier
- Rail-mounted PcAuto infrared route
- Workflow position
- Rail-mounted infrared dryer route with PcAuto-style process control for larger bays that need cleaner layout and repeatable coverage.
- Choose when
- Choose Rail IR PcAuto when the buyer wants professional IR control in a fixed bay or booth layout without the UVA capability of Rail Combi.
- Key difference
- This is the fixed IR-only production route: cleaner and more structured than mobile PcAuto, simpler than IR-UVA Combi or iCure.
- Not first when
- Do not lead with Rail IR when the buyer needs UVA, robotic recipes, handheld flexibility, or has not confirmed bay dimensions.
- Setup / training check
- Confirm rail mount, bay size, reach, power, vehicle movement, PcAuto settings, and whether 4-10 or 4-20 capacity is correct.
- Consumables / aftercare
- Plan rail service, lamp and reflector maintenance, operator program training, and safe movement procedures.
- Next step
- Confirm whether the proposal needs fixed IR-only rail, mobile PcAuto, Rail Combi, or iCure.